Important Notice: This site is no longer being maintained.
Please visit the new Municode site for the latest information.

17.16.030 – Bulk Regulations

Table 17.16-2 establishes bulk regulations for the office/research, manufacturing and public land districts.

TABLE 17.16-2

OFFICE RESEARCH, MANUFACTURING AND PUBLIC LANDS

BULK REGULATIONS

ft = feet

sf = square feet

B = buildings and structures

P = parking lots

ZONING DISTRICT

O-R

M-1

M-2

PL

 

Minimum Lot Area

 

20,000sf

None

None

None

 

Minimum Lot Width

 

100 ft

None

None

None

 

Maximum Building Coverage

 

50%

70%

60%

60%

 

Maximum Building Height

 

60 ft

40 ft

60 ft

50 ft

Front Yard (B, P)

30 ft

20 ft

 

40 ft

 

30 ft

Side Yards:

 

Interior Side Yard

B:  10ft

P:  None

B:  10ft

P:  None

 

B:  20ft

P:  None

B:  10ft

P:  None

Exterior Side Yard (B, P)

30 ft

20 ft

40 ft

30 ft

Rear Yard

B:  30ft

P:  None

B:  20 ft; may be reduced to 10 ft when abutting a railroad right of way

P:  None

B:  20 ft; may be reduced to 10 ft when abutting a railroad right of way

P:  None

B:  30 ft.; may be reduced to 20 ft when abutting a lot in M-1 or M-2 or a railroad right of way

P:  None

Landscape Buffer Yard (B, P)[1]

 

30 ft., except on lots with a building over 150,000 sf of gross floor area: 80 ft.

30 ft.

100 ft. may be reduced to 40 ft. when abutting a collector or arterial street right-of-way of at least 80 ft. in width.

30 ft.

 

[1] Within the zoning districts specified, a landscape buffer yard shall be provided along any lot line that abuts or is across a street from property in any RE, RS, or RT District, and from property in an RM1 or RM2 District.  See Chapter 17.26 for planting and screening requirements for landscape buffers.  Landscape Buffer Yards may include or overlap with other required yards.

(2015-Z-20: § 1; 2011-Z-1: § 13; 2008-Z-24: § 8; 1960-16: § IX (B) (3, 4))