13.20.080 – Surveys/investigations - Hazards
The Director of Public Works shall cause surveys and investigations to be made of industrial and other properties served by the city water supply and distribution system to determine whether actual or potential hazards to such public water supply may exist. Such surveys and investigations shall be open for public inspection to the extent required by the Illinois Freedom of Information Act and shall be repeated at least every two years, or more often if the Director of Public Works shall deem it necessary. Records of such surveys shall be maintained and made available for review to the extent required by law for a period of at least five years.
(1997-M-102: § 1; 1989-M-41: § 1)